2. Drive strictly according to the operating procedure. All dust removal equipment must be turned on first, then the crusher should be started under normal oil conditions, but the driving signal must be issued beforehand.
3. Always observe the lubrication during the working process, check the bearing, bearing temperature, jaw plate, tooth plate, spring, screw and drive belt. The machine was found to have an abnormal acoustic response and immediately stopped processing.
4. Strengthen the maintenance, repair and management of equipment. Do not check and repair the transmission part by hand during operation. It must be stopped when repairs are needed.
5, the crushing process should be given a uniform continuous mine, do not accumulate, avoiding iron block and explosives into the tiger population and cause an accident.
6. When the ore blocks the tiger's mouth, it must be hooked with a hammer or iron hook. When it is unavoidable, it can be temporarily moved to the other side to avoid affecting production, but it must be safe to lift.
7. When tightening the spring pull rod, the two legs should avoid the front side, should stand on the side, and break the injured with the anti-slip buckle.
8. When preparing for shutdown, stop the mine first, and wait until all the ore remaining in the tiger's mouth is discharged.
9. When a sudden power failure occurs, the start switch must be pulled down immediately and the residual ore in the tiger's mouth must be removed.
Indoor lighting is an important part of indoor environment design, and indoor lighting design is conducive to people's activities and safe life.
Indoor Lighting,Led Tube,Led Panel Light,Indoor Light
Guangzhou ZG Scaffolding.co.Ltd , https://www.zgscaffolding.com