On July 22, 2011, 2011 “Concentrated” ZF Asia Pacific Suppliers Conference was held in Suzhou. ZF Group board members, senior executives from Asia Pacific region and representatives of invited suppliers attended the conference.

ZF and the participating suppliers jointly review the brilliant achievements that have been made and discuss the deeper cooperation in the future and seek a win-win situation. Through the form of reports and seminars, suppliers fully understood the ZF Group's dynamics, vision and material management strategy, and exchanged and coordinated the ideas of both parties through in-depth discussions between ZF and suppliers.

PPR Pipe Fitting Mould

cheap plastic injection molds and mould manufacturer 1-Start from part design analysis 2-Mold design drawing and DFM report available so you can see how is the mold going to be before mold making 3-If product is complex,moldflow report will be present as well 4-In house mold making shop ensure you mold quality under well control. 5-Normally it takes 20-40 days to make mold,precise time depends on part design

Ppr Pipe Fitting Mould,Pipe Fitting Mould Making,Polypropylene Random Pipe Fitting Mould,Ppr Fitting Mould

Taizhou Zijing Plastic and Mould Co.,Ltd. , https://www.zijingmould.com